1 |
RWC 1802 - A RING ROAD INTERIM IMPROVEMENT SCHEME |
GRP Lining |
BOOM CONSTRUCTION CO. |
|
2019 |
2 |
AL KHOR EXPRESSWAY |
GRP BENCHING LAMINATION & BENCHING LINING |
JAK CONSTRUCTION |
Cons: PARSONS/ Client: ASHGHAL |
2019 |
3 |
RAS BUFONTAS SPECIAL ECONOMIC |
GRP Lining |
SACYR ENGG. & INFRASTRUCTURES |
|
2019 |
4 |
CP 654 -New Pumping Station 16n & Interceptor Sewers |
GRP Benching Lining & Lining Works |
GEC |
|
2018 |
5 |
Design & Build Of Siteworks And Infr. For Al Wakra Logistics Park, PHASE-1 |
GRP Benching Lining & Lining Works |
Galfar Al Misnad Engg. & Contracting W. L. L. |
|
2018 |
6 |
Ec Head Office Supply & Insta. Of Grp Ladder & Grp Lining |
GRP Lining To Wall & Floor |
Al Bader Construction & Steel Works |
|
2018 |
7 |
Al Khor Expressway Access Road To Palace |
GRP Lining |
JAK CONSTRUCTION |
|
2018 |
8 |
Grp Corrugated Sheet With Upstand |
GRP Lining |
Qatar Galvanizing Co. W. L. L. |
|
2018 |
9 |
Const. And Upgrade Of Al Rayyan Road Project 7 : Contract 1 West Of New |
GRP Lining |
Boom Construction Co. |
|
2018 |
10 |
Al Rayyan Stadium & Precinct Area Reg. |
Supply Of GRP Liners & Lining Works |
Al Balagh Trad. & L & T Ltd. Jv |
|
2018 |
11 |
Supply of GRP Liner & Lining |
GRP Liner, Lining, Ladder & other accessories |
Doha International Co. |
|
2017 |
12 |
Al -Ghanem Site Job#Stc 036 (Job # 103 Mansura) |
GRP Liner, Lining With other Accessories |
Top Grade Trading, Contr. & Transport W. L. L. |
|
2017 |
13 |
C041 ROADS & INFRASTRUCTURE |
GRP Benching, Cover Slab & GRP Lining |
Nael & Bin Harmal Hydroexport Qatar |
|
2017 |
14 |
Mega Reservior Project Prps 5package A, Umm Birka |
GRP Lining |
TCC-CCC JV |
|
2017 |
15 |
G2 Azizyz East Road Improve. Works , Salwa Road , Aziziya |
GRP Lining |
Leighton Contracting |
|
2017 |
16 |
SR_HS_12 (FPS-23) HS-278 & 281 (AL DAFNA) |
GRP Benching Lining & Lining Works |
Temalco Contracting & Trading Co. |
|
2017 |
17 |
Const. And Upgrade Of Al Rayyan |
GRP Pipe Thickness Buildup & Lamination |
Boom Construction Co. |
|
2017 |
18 |
Demolition & Utilities Works Along ''A'' Ring Road (P013/P028) |
GRP Lining |
PETROSERV LTD. |
|
2017 |
19 |
C111 Construction Of 3 Newschool PKG2A/STG10A - ASHGHAL PWA |
GRP Lining & Ladders |
Tadmur Contracting W. L. L. |
|
2016 |
20 |
GRP Lining To Steel Surface |
GRP Lining Of Tank 2mm Thk. |
DUTEST QATAR W. L. L. |
|
2016 |
21 |
Roads & Infrastructure Work inBani Hajer (North) Phase 1 & 2 -PACKAGE 02 |
GRP Lining |
Hamad Bin Khalid Contracting Co. W. L. L. |
|
2016 |
22 |
AL Muntazah Street package #13 |
GRP Lining |
AL Jaber & Partners - Construction |
|
2016 |
23 |
Aqua Chemie warehouse in Ras Laffan |
GRP Lining on ISO Tank |
Aqua Chemie |
|
2016 |
24 |
Sewer, Repair, Replacement Rehabilation Frame Work |
GRP Liner, Lining, Ladder & other accessories |
Qatar Trading & Contracting Group |
|
2016 |
25 |
Grp Liner & Ladders For Call Off Contract |
GRP Liner, Lining, Ladder & other accessories |
Al Khayarin Group Trading & Contracting |
|
2016 |
26 |
Liners For Various Sites |
GRP Liner, Lining, Ladder & other accessories |
Licuas Trading & Co Ntracting Co. |
|
2016 |
27 |
Qatar Economic Zone |
GRP Lining to Manhole |
Urbacon Trading & Contracting |
Manateq |
2015 |
28 |
Utility Tunnel Control Centre and VIP Access Building |
GRP Lining & Benching |
National Industrial Contracting Co |
Dorsch |
2015 |
29 |
Lusail Expressway |
GRP Liner, Lining, Ladders & Sealing Plate |
Boom Construction Co |
|
2015 |
30 |
Sewer Extension & House Connections AL Jazeera /Qatar Televisions Stations |
GRP Lining |
Tamalco trading & Contarcting Co |
|
2015 |
31 |
(U-278-278-14-QEZ) Qatar Economic Zones |
GRP Lining |
Urbacon Trading & Contracting |
|
2015 |
32 |
Road & Infrastucture in Doha Indystrial Area - Package 1 |
GRP Lining |
Qatar Trading & Contracting Group |
|
2015 |
33 |
CP 283 Rehabilitation of Existing Sewer within Doha C763/2 |
GRP Lining |
Qatar Building Company (QBC) |
|
2015 |
34 |
Construction of PS-70 Area Sewer CP 745/4 |
GRP Liner, Lining & Ladder Phase #2 |
Al Waha Est for Contracting & Trading |
|
2015 |
35 |
DW 047 Flow Diversion Schemes for PS 12 BI & PS barzan Camp. |
Manhole GRP Works |
Qatar Trading & Contracting Group |
|
2015 |
36 |
Sewer Call off Maintenance Phase 1 1-AA/DOM/13-14/M/1542-4.07/G |
GRP Lining |
Qatar Trading & Contracting Group |
|
2015 |
37 |
Industrial Area , Strt No. 52 , Sewage Treatment |
GRP Lining |
Petroserv Ltd |
|
2015 |
38 |
Industrial Area Sewage Treatment Facility (STF) |
GRP lining to Pumping Stations |
Petroserv Ltd |
ASHGAL |
2014 |
39 |
New Doha International Airport Project |
GRP lining to Chambers |
CDC Takeneka |
|
2014 |
40 |
Katara Cultural Village |
GRP Lining to Manholes |
Galfar Almisnad |
|
2014 |
41 |
FEC Workshop in MIC |
GRP lining to MS Tanks |
Future Engineering |
|
2014 |
42 |
Multipurpose Hall at Alsaad |
GRP Lining to Firewater Tanks |
AKTOR |
|
2014 |
43 |
Qatar Steel Technology |
GRP lining to MS Tanks |
|
Qatar Steel Technology |
2013 |
44 |
Al Andalus Aluminium |
GRP lining to concrete pickling tank & Treatment Tanks |
Al Andalus Aluminium |
|
2012 |
45 |
SASSCO |
GRP lining to MS Tanks |
Specialised Aluminium |
SASSCO |
2012 |
46 |
Commercial Building |
GRP Lining to Concrete Swimming Pool |
Multiplex-Medgulf |
MZ & Partners |
2011 |
47 |
District Cooling Plant at Pearl Qatar |
GRP lining to concrete tank |
QACC |
Dar Al Handasah |
2011 |
48 |
Powder Coating Plant |
GRP lining to pickling tank |
Aluminium Tech. |
|
2011 |
49 |
Al Amir Interchange |
GRP lining to Holding Tanks |
Al Jaber Infrastructures |
Ashghal |
2010 |
50 |
Rayyan Road |
GRP lining to Holding Tanks |
Boom Construction |
Ashghal |
2009 |
51 |
Qatargas Expansion |
GRP Lining to Acid Storage Tanks |
Kettaneh/Muelhan Dehan |
Qatargas |
2008 |
52 |
Substations |
GRP lining to Holding Tanks |
Gulf Contracting Co. |
Siemens Electric |
2008 |
53 |
Ras Laffan Power Plant |
GRP lining to Holding Tanks |
Larsen & Toubro Qatar |
Ras Laffan Power Company |
2006 |
54 |
Museum of Islamic Arts |
GRP lining to Holding Tanks |
Baytur/Mercury |
Ashghal |
2006 |
55 |
Qatargas Expansion - Trains 3 & 4 |
GRP lining to Holding Tanks |
Consolidated Contr. Int'l Co.(CCIC) |
Qatargas |
2005 |
56 |
CP 379/4 |
GRP Lining to Mild Steel Ballast in Aeration Tanks |
AA Engg. Services |
KEO International |
2004 |
57 |
Sewage Treatment Plant |
GRP lining to Catchment Basins and various concrete tanks |
Razak Contr. |
Ministry of Public Works |
2003 |
58 |
Al Udeid Air Base |
GRP lining to Holding Tanks |
Rizzani De Eccher |
US Army |
2002 |
59 |
NGL – 4 |
GRP lining to Acid Containment tanks |
Hyundai-Snam/ Gulf Housing |
Qatar Petroleum |
2001 |
60 |
MTBE Plant - QAFAC |
GRP lining to inspection chambers & lifting stations |
Chiyoda Corporaton |
QAFAC |
1999 |
61 |
Ras Gas Plant |
GRP lining to chlorine pots |
JGC – Kellogg |
Ras Gas |
1999 |
62 |
Galvanising Plant |
GRP lining to pickling tank |
Seashore Engg. |
|
1998 |
63 |
Work orders |
GRP lining to trenches & weirs carrying brine |
Fochi / Teyseer Contr. |
Ministry of Electricity & Water ( Ras Abu Fontas & Ras Abu Aboud Power Stations) |
1994 |
64 |
North Field Development Project - Package 10 |
GRP lining to internal of 40 in. dia carbon steel pipe carrying brine |
CCIC/Mideast Constructors |
QP(QGPC) |
1992 |
65 |
Refurbishment |
GRP lining to concrete surfaces in aquarium and lagoon |
|
Ministry of Information |
1991 |
66 |
Elevated Water towers |
Epoxy lining to concrete surface on the inside of tanks. |
Lotus Contg. / Tawfeeq Contr. |
Ministry of Electricity & Water |
1990 |
67 |
Work Order |
Glass Flake lining to internal & external of steel brine tank |
|
Ministry of Electricity & Water |
1988 |
68 |
Gharafa Reservoir |
GRP lining to concrete walls, floor and roof |
ACEC |
Ministry of Electricity & Water |
1986 |
69 |
Maintenance / Shutdown |
GRP lining to concrete & steel surfaces containing process water, chilled water and potable water |
Various |
QP(QGPC), QAPCO, QAFCO, QASCO |
1980 |
70 |
Private Contractors |
GRP lining to chilled water tanks, Swimming pools, lagoons, oil storage tanks, processing chemical tanks. |
Various |
Various |
1980 |