S. Nr. PROJECT DESCRIPTION CLIENT YEAR
1 Modification GRE Fire Water Pipelines 6"- 10" Qatalum/ Gent Engg. 2014
2 Repairs GRP TSE Pipeline Repairs Ashghal/ Various Contractors 2014
3 RLIC Laydown Area GRE Fire Water Pipelines 6" Watania/ Gulf Incon 2014
4 North Field Alpha Offshore RTRP Pipe Jointing 2" - 3" Rasgas-/ Madina Grou[ 2014
5 Modification GRE Fire Water Pipelines 6"- 10" QASCO-BEMCO 2014
6 Wedding Hall at Wajba GRE Fire Water Pipelines 6" - 12" CESCO 2014
7 New Pipelines GRE Fire Water Pipelines 8" - 12" Qatalum/ CESCO 2014
8 New Pipelines GRE Fire Water Pipelines 8" - 12" Qatalum/ Dutco McDonnell 2014
9 RLIC Laydown Area GRE Fire Water Pipelines PPE/ Gulf Incon 2010-2013
10 Wedding Hall at Wajba GRE Fire Water Pipelines CESCO 2010-2013
11 New Pipelines GRE Fire Water Pipelines Qatalum/ Dutco McDonnell 2010-2013
12 New Pipelines GRE Fire Water Pipelines Qatalum/ CESCO 2010-2013
13 Modification GRE Fire Water Pipelines 2"- 8" QASCO-BEMCO 2010-2013
14 EPIC GRE Pipelines - Changing Manual Valves on
Deluge System to Automatic
Oryx GTL - Black Cat Engg. 2010-2013
15 Modification Various GRE Spool Fabrication for Offshore use Occidental Petroleum/ DOPET  2010-2013
16 Barwa Development GRP Fire and Chilled Water Line Jointing Shapoorji Pallonji/Mechel Engg. 2010-2012
17 Modification GRV Drain Lines – (20BAR Testing) at RLIC Plant Dolphin Energy Ltd./ Black Cat Engg. 2010-2012
18 Repair works Clorine Line Repair at Chlorination Plant  Rasgas-RLIC Port 2010-2012
19 Repair works Repairs to Sea Water Line – 8” & 10” QASCO 2010-2012
20 Call Off Contract Extension till 2013 Maintain/ service GRV pipes & fittings ranging from 1” to 72”.  – All repairs joints by lamination QAFCO 2010-2012
21 Repair works Diesel Tank & Nozzle repair Shell GTL – Pearl 1 Platform/ Balmoral UK & J Ray McDermott 2010-2012
22 Maintenance Works Various Platforms Maintenance – Repair of 1” Saddle Pick repair Occidental Petroleum 2010-2012
23 Modification 2” Saddle with 2” Nozzle fixing to 24” Header – 16 nrs. (Repeat Order –II nd phase) Rasgas/ Madina Group 2010-2012
24 Refurbishment Work 6”/8” CS Pipe GRP lining Q-Chem – Mesaieed & RLIC  2010-2012
25 Refurbishment Work CS pipe Lining Qatargas Off shore NFB 2010-2012
26 Repair works GRP Drain Line Repair Qatargas Off shore NFB 2010-2012
27 Plant Commissioning GRP Piping for GRP Tanks-Various Diameters – 2”–10“ Qatalum/ Metito 2009
28 RLIC to Mesaieed SGTP Line GRE Piping Jointing &- Supervision of  Laying and Testing of GRE piping QP – Punj Lloyd – K4 Engg 2009
29 General Shutdown Works Maintenance of GRP/ GRE/ GRV Pipelines QASCO/ Qatar Navigation 2009
30 Desalination Plant GRE Pipe jointing Pearl Qatar/ Metito 2009
31 COD Tank GRE Piping 2" - 16" Supply & Installation QAPCO/ TRAGS 2009
32 EPIC for 18” MPP from QP Refinery to Doha Depot GRE piping for drain lines at Loading Stations (Continued In 2010 Also in Refinery) QP/ Punj Lloyd  2009
33 GTC 07/158/FP-EPIC for Smokeless Flare and Automatic Blowdown System & New Control Room at FSP GRE Piping 1" - 16" Supply & Installation QP Dukhan 2009
34 Call off Contract till 2012 Maintain/ service GRV pipes & fittings ranging from 1” to 16”.  – All repairs joints by lamination QP/ ETS 2009
35 General Shutdown Works Maintenance of GRP/ GRE/ GRV Pipelines QAFCO 3 2009
36 Call off Contract CO 60048 (from 2009-2012-extendable by 2 years) Maintain/ service GRV pipes & fittings ranging from 1” to 72”.  – All repairs joints by lamination QAFCO 2009
37 Repair works GRE Piping repairs at Khatiyah Main QP/ Danem Engg. 2009
38 Repair works GRE Piping Repairs Qatargas 2009
39 CP 627 & Lusail STW GRE/ GRP Piping & Deodorizer Ducting Degremont  S.A 2008
40 CO 11361 Extension of Frame/ Call Off Contract Maintain/ service GRV pipes & fittings ranging from 1” to 72”.  – All repairs joints by lamination QAFCO 2008
41 Repair works GRE Piping repairs Qatargas Offshore Platform NFB 2008
42 Repair works GRE Piping repairs QP, Dukhan Khatiya Main & South 2007
43 Modification GRP Pipe Spool Modification QASCO/ Danem Engg. 2007
44 GTC 042/06 - General Shutdown works Maintenance of GRP/ GRE/ GRV Pipelines Qafac/ Danem 2007
45 Utility Area GRE Pipe Fabrication & jointing QAPCO 2007
46 COD Tank GRP Piping 2” & 10” QAPCO 2007
47 Potable water GRE Piping 10” QAFCO/ Qatar Navigation 2006
48 GTC 162/05 - Fire water Ring Main at FSP - Dukhan GRE Piping Fabrication and Jointing of  6” - 18”  (600 mtrs) QP/ Black Cat Const. 2006
49 Replacement Partial replacement of Potable water Line (200, 250 & 300 ND piping) QASCO/ Qatar Navigation 2006
50 Air Compressor Skid Erection GRE Piping - Supply and Return  Cooling water line (100 mm ND) QAFCO/ Qatar Navigation 2006
51 Chemical Pits GRE Piping for Firewater and Drain Lines Qatar Power Plant/ Gulf Housing and Construction Co. 2006
52 GTC 148/02 - Modification Cooling Water Pond A & B-Variation Replacement of CS Header with GRE Header - 12” & 6” piping QP/ Al Muftah Contracting Co.  2006
53 CC3 Water Treatment Auto Strainer By Pass Line Modification of 24” & 20” GRP Line QASCO/ Danem Engg. 2006
54 GTC 148/02 - Modification Cooling Water Pond A & B GRE Piping-Supply and Installation of 12” & 6” piping QP/ Al Muftah Contracting Co.  2005
55 GTC 132/ 04 - Dukhan FSP GRE Piping for FW Pump and replacement of FW Ring. GRE pipe field jointing of 1” - 16” QP/ Danem Engg. 2005
56   GTC 101/02-FSP, S.Khattiya, N.Fahail & S.Fahail Fire Water GRE Pipe Field Jointing App- 1500 mtr. 12” piping QP/ Black Cat w.l.l. - Dukhan 2005
57 Sea Water Cooling System GRP Lamination pipe Field -jointing of 24” & 52” Oryx GTL - Qcon 2005
58 CO 25106 - Desalination Plant 6 GRP(Vinylester) Piping - 24”,16” and 6”, Lamination Jointing system QAFCO 2005
59 Refurbishment Work   GRE Piping for Shower Line at PU & PR Deck Qatargas Offshore Platform NFB 2004
60 QGS/O(M)/CWO/113/03/(C8) Repair of 24” Underground Firewater GRE Pipeline                      Qatargas 2004
61 Pipe Repair Services Repair of Fire Water GRE Pipelines – 6” & 8” Anadarko at Al Morjan 2004
62 Pipe Repair Services   GRE Pipe repair services – various diameters Q-Chem 2003
63 Civil Project 675 Supply and lamination works of 900mm dia. ( 900mtrs) and 1000mm dia ( 1300mtrs) GRV pipes HBK Contr. 2003
64 Electro chlorination Upgrade GRV Piping- lamination joints for (Approximately 875 L.Mtrs of 1” – 10” piping QAFCO/ Al Rania Projects, Doha & Titanium Tantalum Products, Chennai 2003
65 Frame Contract/Call-off Contract CO -11361 -2002 for 3 years(2002 – 2005, Extendable by 2 years) ) extended up to 2008 Maintain/ service GRV pipes & fittings ranging from 1” to 72”.  – All repairs joints by lamination QAFCO 2002
66 QGS/O(M)/CWO/098/02[C7] GRE Pipe spooling 18” & 20” with break flange at 18 bar pressure North Field Bravo(Offshore Platform) – Qatargas 2002
67 Ras Abu Fontas ‘A’ & ‘B’ Power Stations Rerouting & By pass connection of Fire Hydrant lines (10” GRV piping – 80 L.Mtrs.) Noors Engg. Services w.l.l. 2002
68 NGL3,Mesaieed Lamination & Adhesive Jointing and Hydrotesting of GRE pipelines 2” – 36” (610 L.Mtrs.) Petrofac International/ Black Cat Construction w.l.l. 2002
69 LTC/E & V/004/01/C4 GRV/Carbon Steel piping– 3”(120 L.Mtrs.) with Carbon Steel Tank for fire water to condensate jetty() Qatargas 2001
70 Rerouting GRE piping for Raw Water - supply and installation of14”,12” and 2” pipes & fittings(597 L.Mtrs.) QAPCO 2001
71 Refurbishment Work Dismantling of existing carbon steel utility piping, supply and installation of GRE piping – 2”,3” and 4” pipes & fittings(130  L.Mtrs.) Qatar Petroleum, PS4(North Field Alpha) 1995 – 2000
72 Shutdown Works Laying and site lamination of ND500 Vinylester Pipe (110 L.Mtrs.) QP, Halul     
Island
1995 – 2000
73 Maintenance Works Rerouting of 4” Hypo chlorite GRP  pipeline with GRP supports QAPCO 1995 – 2000
74 Civil Project 391 Vinylester ND 900 Pipe joint lamination (57 nrs.) Qatar Building Company 1995 – 2000
75 Water Distribution System Insitu joining of 4” GRE potable water pipes(500 L.Mtrs.) QP, Halul     
Island/ MECON
1995 – 2000
76 Warehouse Construction GRE piping spools ND 300 - supply and installation for oil-water separator QP, Halul     
Island/ HBK Contr.
1995 – 2000
77 Plant Commissioning Tie up of GRP piping to Hastelloy pipes Rasgas/ GITIC Engg. 1995 – 2000
78 Maintenance Works Remedial works on ND 400 GRP pipes (lamination Joints - VE) QASCO 1995 – 2000
79 Doha West Sewage Treatment Plant Fixing of flow meter on ND 500 GRP pipe Khalid Al Mass Contr. 1995 – 2000
80 Maintenance Works 4” Hypochlorite pipeline(60 L.Mtrs.) replacement (Lamination Joints -VE) QAFCO 1995 – 2000